Lewis & Clark Regional Water System: Well Field Facilities - Sites C & D Pumps and Sites A & E Wells
BAI Number: 20000.15.01
Bid Schedule: Lump Sum Bid Schedule
Probable Construction Cost: $6,000,000.00 to $7,000,000.00
Deposit for Plans & Specs:
(Includes sales tax)
$53.00 (Half-size) - Non-refundable
$21.20 (Electronic) - Non-refundable
 
Pre-Bid Meeting Date: 03/30/2010
Pre-Bid Meeting Time: 01:00 PM
Pre-Bid Meeting Location: Lewis & Clark Trailer at the Lewis & Cleark Water Treatment Plant Site, 31476 Highway 19 (north of Vermillion on Highway 19), Vermillion, South Dakota
 
Project Bid Date: 04/15/2010
Project Bid Time: 02:00 PM
Project Bid Location: Lewis & Clark Regional Water System Office, 401 E 8th Street, Suite 306, Sioux Falls, SD, 57103
Project Deadlines: 11/12/2011 for substantial completion
12/16/2011 for final completion
 
Addendum Dates: 04/01/2010 Mailed - Click here to download
04/12/2010 Faxed - Click here to download
 
Additional Files: Appendix - Geotek Phase 1 Site Assessment (03/08/2010)
Appendix - Layne Report (03/08/2010)

Scope of Work:
  • SITES C & D PUMPS
  • Install piping and fitting connections from existing well casings to existing site piping. Work includes pitless adapters and connections for four (4) angle wells.
  • Furnish and install pumps and associated equipment in four (4) existing angle well and two (2) vertical wells located in existing well houses.
  • Electrical, mechanical and control work at well houses and vaults and installation of electrical wiring through the various sites. Electrical work includes standby generators at Sites C&D and variable speed drives for pump motors.
  • Clean up, site restoration and all other miscellaneous work required, not herein mentioned, but inferred from the construction contract documents.
  • SITES A & E WELLS
  • Clearing, earthwork, site grading and installation of gravel surfacing for well site access roads at Sites A&E.
  • Drilling and construction of five vertical wells, three at Site A and two at Site E, with associated materials and testing.
  • Approximately 4,000 LF of piping (12” through 48” diameter) to connect the wells through the sites to the existing Lewis & Clark Raw Water Pipeline.
  • Construction of two concrete masonry well houses and three underground cast-in-place concrete valve vault structures and accessories.
  • Electrical and mechanical work at well houses and vaults and installation of electrical duct bank and wiring to the various sites. Electrical work includes standby generators at Sites A&E and variable speed drives for pump motors.
  • Furnish and install pumps and associated equipment in valve vaults and well houses for all five wells.
  • Clean up, site restoration and all other miscellaneous work required, not herein mentioned, but inferred from the construction contract documents.
Bid Documents:
Bid shall include all the sheets in "yellow" in the Specifications, including the following:
  • (Follow Instructions to Bidders) Bid shall include (but may not be limited to) the following:
  • Representations, Certifications and Other Statements of Offerors (Form DI-2010) – Part A-E
  • Certificate of Nondiscrimination – Sheet CON-1 – Part G
  • Elimination of Segregated Facilities – Sheet EOSF-1 – Part H
  • List of Subcontractors, Suppliers, etc. (to be submitted within 48 hours after Bid Opening)
  • Bidders Statement of Qualifications
  • Bid Form
  • Bid Security – Either 10% Bid Bond or a certified check, cashiers check or bank draft in the amount of 5% of the total sum of the Bid
Contact Persons:
  • Civil, Process, Mechanical - Daniel Graber, HDR-Sioux Falls, (605) 977-7767
  • Civil, Process, Mechanical - Cecil Coombs, HDR-Sioux Falls, (605) 782-8113
  • Structural - Wade Hargreaves, HDR-Sioux Falls, (605) 977-7744
  • Architectural - Vince Fallon, HDR-Omaha, (402) 339-1254
  • Controls - Justin Petersen, Banner Associates, Inc. (605) 692-6342