Lewis & Clark Regional Water System: 85th Street Reservoir
BAI Number: 20000.17.01
Bid Schedule: Lump Sum Bid Schedule
Probable Construction Cost: $4,500,000.00 to $5,000,000.00
Deposit for Plans & Specs:
(Includes sales tax)
$53.00 (Half-size) - Non-refundable
$21.00 (Electronic) - Non-refundable
 
Pre-Bid Meeting Date: 07/08/2009
Pre-Bid Meeting Time: 02:00 PM
Pre-Bid Meeting Location: Lewis & Clark Regional Water System Office, 401 E 8th Street, Suite 306, Sioux Falls, SD, 57103
 
Project Bid Date: 07/22/2009
Project Bid Time: 02:00 PM
Project Bid Location: Lewis & Clark Regional Water System Office, 401 E 8th Street, Suite 306, Sioux Falls, SD, 57103
Project Deadlines: 11/01/2012 for substantial completion
12/31/2012 for final completion
 
Addendum Dates: 07/20/2009 Faxed - Click here to download
 
Additional Files: LCRWS 85th Street Geotek Report (07/13/2009)
City of Sioux Falls Supplemental Standard Specifications for Sanitary Sewer Construction - Section 100 (07/13/2009)
Pre-bid Conference Roster Sheet (07/15/2009)

Scope of Work:
  • A 3.0 million gallon composite water tower with a height to overflow of 180 ft
  • Ground floor of water tower will include an 1,800 sq ft process area, including interior piping, metering and chemical feed equipment and 900 sq ft of administrative area
  • Interior piping within the tower includes, but not limited to, large diameter isolation valves, air valves, check valves, flow control valves and all necessary fittings
  • Chemical feed equipment will include two (2) 1,000 gallon storage tanks and associated chemical feed pumps for sodium hydroxide and sodium hypochlorite systems
  • All mechanical, electrical and control equipment necessary to provide a fully functioning facility
  • Site piping including approximately 190 LF of 36”, 70 LF of 24” and 205 LF of 12” diameter piping including corrosion protection (including but not limited to galvanic anodes and coatings)
  • Site work including but not limited to fill, grading, access road construction, topsoiling, seeding and restoration
  • Construction of 400 LF of 8” trunk sanitary sewer pipe, a new manhole and 210 LF of 6” sanitary sewer service pipe
  • Approximately 225 tons asphalt concrete composite and 450 tons of aggregate base course and
  • Clean up, startup services, and all other miscellaneous work.
Contact Persons:
  • Tower, Site Work and Piping - Chad Bachman, Banner Associates, Inc. (605) 692-6342, chadb@bannerassociates.com
  • Architectural - David Lorang, Banner Associates, Inc. (605) 977-6342, davel@bannerassociates.com
  • Structural - Bryan Asche, Banner Associates, Inc. (605) 692-6342, bryana@bannerassociates.com
  • Mechanical Systems - Paul O'Brien, HDR (402) 399-1027, Paul.O'Brien@hdrinc.com
  • Electrical Systems - Kevin K. Thernes, HDR (402) 399-1295, kevin.thernes@hdrinc.com
  • Process Instrumentation and Controls - Chad Bachman, Banner Associates, Inc. (605) 692-6342, chadb@bannerassociates.com