Larson Ice Center 2009 Exterior Improvements
BAI Number: 20882.00.11
Bid Schedule: Lump Sum Bid Schedule
Probable Construction Cost: $500,000.00
Deposit for Plans & Specs:
(Includes sales tax)
$53.00 (Half-size) - Refundable
$106.00 (Full-size) - Refundable
$21.00 (Electronic) - Non-refundable
 
Project Bid Date: 03/31/2009
Project Bid Time: 01:30 PM
Project Bid Location: City Clerk, 311 Third Avenue, Brookings, SD 57006
Project Deadlines: 10/02/2009 for substantial completion
 
Addendum Dates: 03/20/2009 Faxed - Click here to download
03/25/2009 Faxed - Click here to download
03/27/2009 Faxed - Click here to download

Scope of Work:
  • SITE WORK WILL INCLUDE:
  • Excavation and backfill for new canopy foundation
  • Removal of designated pavement, curb and gutter, and sidewalk
  • New pavement, curb and gutter, and sidewalk
  • Re-grading
  • Storm sewer installation
  • Striping
  • GENERAL CONSTRUCTION WILL INCLUDE:
  • Concrete
  • Structural steel
  • Metal panel roofing, metal wall panels, flashing, gutter and downspouts, and parapet cap
  • Paint finishes
  • Signage
  • Illuminated letter system
  • Electrical work will include power and lighting.
Contact Persons:
  • Architectural - Beth Tellekson, Banner Associates, Inc., 605-977-6342
  • Structural - Bryan Asche, Banner Associates, Inc., 605-692-6342
  • Civil/Site - Brad Wermers, Banner Associates, Inc., 605-692-6342
  • Electrical - Jeff Renken, Associated Consulting Engineers, Inc., 605-335-3720