SDSU Ag Engineering Roof Replacement
BAI Number: 20876.00.00
Bid Schedule: Lump Sum Bid Schedule
Probable Construction Cost: $220,000.00 to $270,000.00
Deposit for Plans & Specs:
(Includes sales tax)
$21.00 (Electronic) - Non-refundable
 
Pre-Bid Meeting Date: 05/08/2008
Pre-Bid Meeting Time: 01:30 PM
Pre-Bid Meeting Location: At the Project Site
 
Project Bid Date: 05/15/2008
Project Bid Time: 03:00 PM
Project Bid Location: SDSU Campus, Administration Building, Room 304
Project Deadlines: 08/01/2008 for substantial completion
 
Addendum Dates: 05/12/2008 Faxed - Click here to download
05/14/2008 Faxed - Click here to download

Scope of Work:
  • Remove and replace existing built-up roofing system.
  • Provide new R-30 insulation and new roof membrane.
  • Extend existing mechanical equipment curbs to accommodate new insulation thickness.
  • Provide new roof drain/piping to scuppers at grade (four locations).
  • Coordinate removal/relocation/re-installation of existing research equipment with Owner.
Contact Persons:
  • Architectural - Les Rowland, Banner Associates, Inc., (605) 692-6342