Pipestone Municipal Fire Station Addition and Remodel
BAI Number: 07140.00.75
Bid Schedule: Lump Sum Bid Schedule
Probable Construction Cost: $1,600,000.00
Deposit for Plans & Specs:
(Includes sales tax)
$106.00 (Full-size) - Refundable
$21.00 (Electronic) - Non-refundable
 
Pre-Bid Meeting Date: 02/12/2008
Pre-Bid Meeting Time: 10:00 AM
Pre-Bid Meeting Location: Construction Site
 
Project Bid Date: 02/26/2008
Project Bid Time: 05:00 PM
Project Bid Location: City Administrator at the City Office Building, 119 2nd Avenue SW, Pipestone, MN 56164
Project Deadlines:
 
Addendum Dates: 02/15/2008 Mailed - Click here to download
02/20/2008 Mailed - Click here to download
02/21/2008 Faxed - Click here to download
02/21/2008 Faxed - Click here to download
 
Additional Files: Soils Report (02/04/2008)

Scope of Work:
  • Construction of a 6,500 s.f. single story three-bay fire truck and one bay truck wash addition. Construction of the addition will consist of exterior concrete block/brick veneer walls with a precast concrete structural tee roof system.
  • Remodel 5,800 s.f. of the existing fire station. The remodel shall include new interior wall construction (both masonry and metal stud framing) to accommodate ADA accessible restrooms, new fire chief office, training room, new kitchen cabinets, and update of interior finishes.
  • Construction of site improvements including PCCP parking lot, curb & gutter, sidewalk and landscaping.
  • All other miscellaneous work required, not herein mentioned, but inferred from the construction contract documents.
Contact Persons:
  • Architectural: Les Rowland, Banner Associates, Inc., 605-692-6342
  • Structural: Colin Zwaschka ,Banner Associates, Inc. 605-692-6342
  • Civil: Lance Weatherly, Banner Associates, Inc., 605-977-6342
  • Civil: Scot Leddy, Banner Associates, Inc., 507-562-2957
  • Electrical: Harlan Osterloo, West Plains Engineering 605-362-3753
  • Mechanical: Darrin Tille, West Plains Engineering 605-362-3753